Cabin John Village will begin a new round of construction on Monday (Oct. 15th), kicking off a nine-month project that will transform the center’s outdated facade and front parking lot. It’s the next phase of a long-term master plan from D.C. developer Edens, which has been studying the community’s needs since it bought Cabin John two years ago. “We heard you, we watched, we observed, we listened,” says spokesman Meghann Klein. The ’70s-style maroon roofline is going away, to be replaced by a clean, contemporary design with a wood under-canopy and updated lighting. New landscaping, benches and tables will be added throughout the property, especially in the area outside Goldberg’s Bagels. The front parking lot will be re-paved and reconfigured, with brighter lights, wider spaces and curbside parking for quick trips. Also on the way: decorative string lights and better signage. “The property is going to feel more homey, more like a neighborhood,” Klein says. All businesses will remain open during construction, which should be done by next spring.